Monday, November 12, 2007

The Power Pole...


And the man who made it happen. Mike worked really hard to get our temporary power pole set-up - he basically rewired it all by himself. Last week it passed the L&I inspection and Puget Sound Energy gave it a thumbs up and we now have power! Yeah - no more generator!

Our Views

The view from our master bathroom bathtub
The view from our master bedroom
Going down the stairs
Some interior framing

And a Second Floor...

Rear view of the house. First floor left to right: kitchen window, sliding door (there will be a deck soon). Second Floor: Master bath windows, guest bath window, 3rd bedroom window.

The trusses were delivered and they have started rolling them up...won't be long and we will have a roof!

From left to right on the bottom floor: Living room windows, Front door, Family Room windows and french doors. Second Floor: bedroom windows, hallway windows, master bedroom windows.


Framing Begins


Starting to look like a house

The Foundation


The finished product! Bring on the water - this house is built for it (notice the flood vents)...

Forming up the Foundation







The concrete forms and a hardworking crew!

The project begins...


The hole has been dug and footings have been poured